Can I have a Garage delivered in January?


Wondering whether you can really get a timber Garage delivered in January, and more importantly, whether it’s a good idea? If you’ve had your eye on a watertight timber Garage for a while but you’re putting it off because it feels like the wrong time of year, this post is for you.

It’s fair enough to have reservations. You want to get your Garage project just right. Whether it’s Christmas spending or the bad weather that’s got you hesitating, the worry is real. But you’re not alone. I’m going to take you through the ins and outs of a January Garage project: the benefits, hesitations, and what a real timeline could look like. You’ll have a realistic idea of whether a winter Garage delivery will work for you.

Contents

    Is it possible?

    Yes! Here at G&M we deliver year-round. We’ve got a small stock build scheduled for the first week of January — much to the team’s horror, but after that we’ll be right back into the swing of things. And right now we’ve even got a handful of delivery spaces left for January 2027 (scroll down for exact dates). 

    It’s natural to have hesitations about taking on a project at this time of year. You’re probably worrying about bad weather disrupting your delivery, or the temperature being too low for your base to go down. On top of that, January likely feels like the totally wrong time of year for a project like this. But the truth is that’s there’s benefits and drawbacks to every season, and January could actually be the ideal time for you!

    What are the benefits of a January Garage delivery?

    Let’s get into why a January Garage delivery works well. 

    1. Beat the price increase

    In January at G&M we put the prices of our buildings up. We don’t do this for the craic, we do it to keep up with the rising costs of… well, absolutely everything. It’s our dream to keep providing our dear Sheddies with timber buildings till the end of time. To do that, we either raise our prices or cut corners on quality, and the latter isn’t an option for us. 

    So in January the prices of our builds will go up by a small percentage. The price change isn’t anything astronomical, but when a Garage project is already a big spend, every penny counts. A January Garage delivery lets you be one of the last projects to benefit from 2026 pricing, which can make a real difference to your total. 

    To secure a January Garage delivery slot at 2026 pricing, all you need to do is book by 30th November. If you’re looking to save where you can, definitely consider a project in January. 

    Gillies and Mackay single timber garage with pent roof design, finished in grey painted cladding and used for car and bicycle storage in a residential garden setting

    2. More time for your timber to dry

    Our Garages are made with high-quality Scandinavian redwood, chosen for its stability and durability. Timber quality is under the watchful eyes of succession director Gordon and lead woodcutter Bobbie. They’re very strict about making sure only the best timber makes its way into your building. Every Garage gets that treatment, but here’s an insider tip: January builds get timber that’s had a little extra drying time. 

    Over Christmas we’re off for two weeks which is the only time of year that operations fully stop. When we get a timber delivery, it goes down to the yard and gets painstakingly “pinned” which involves separating each board of timber so it can fully dry out. Timber for a January build has the longest drying time, and your Garage is all the better for it. 

    3. Garage Door Availability

    We get the majority of our Garage Doors from Tayside Garage Doors who supply and install garage doors across Dundee, Perth, Fife and Angus. After our delivery team comes to install your Garage, the Tayside Garage Door team comes to fit your door. 

    January is quiet for Tayside Garage Doors, which means they have the best availability for our projects. With a January delivery you’re more likely to get your door fitted the very next day after the build goes up, compared to busier times like summer, when you might need to wait a couple of days. Your Garage is ready to go sooner so you can get inside and start using it. 

    Two men are carrying a packed up white garage door into a blue timber garage.
    Tayside Garage Doors Installation

    What are the hesitations with a January Garage delivery?

    These are some of the main hesitations we hear from customers about winter Garage deliveries, and how we handle each.

    1. Will my concrete base be set in time?

    Some customers worry that a concrete base won’t have enough time to set in the winter. While it’s true that the weather does affect how long a base takes to set, this in no way means that you can’t put down a base in winter. 

    During summer it only takes up to a week for a concrete base to set, but in winter we leave them for two weeks to be on the safe side. This is because the colder the temperature, the longer the concrete takes to harden. 

    Solid Ground, one of our accredited trades, instals concrete bases year-round so they’re always prepared for the cold temperatures. When it’s cold the team uses a tent to cover the concrete base whilst it’s setting. The tent keeps frost and wind off the surface of the concrete during the first critical days so that it hardens properly. This is exactly what they did for this Garage project, and the results speak for themselves. 

    A black tent with orange cones around the front, over a concrete base with a garage next too it and a tree behind it.
    Concrete Base Tent
    Concrete Base

    2. Will the weather postpone my delivery?

    It’s fair to assume that putting a timber building up in the wind and rain is a no-go, but it’s actually rarely a problem. At G&M, we deliver and assemble our buildings in all kinds of weather, so it takes a bit more than rain to call off our delivery team. As long as you offer them a cup of tea or coffee to warm up, they’re happy to work through the worst of it. 

    We tend to only move one project a year because of bad weather, if any. The only one I can remember in my two years here was a Workshop that was rearranged because of high winds. In this case it was too dangerous to assemble it in the wind, so it was moved to the next week. 

    In the unlikely event that your Garage can’t be delivered because of bad weather, we’ll shift things around in our diary, and deliver your building as soon as possible, within a two week window of your original date. 

    3. Isn’t summer the right time?

    Summer seems like the obvious time to start a garden building project. You’re out in the garden, it gets you thinking, and you start imagining how a Garage could transform your space. Although it might feel odd to start a Garage project in winter — like going on a summer holiday in February. There’s actually benefits to buying in every season. 

    Summer is great because it’s more likely to be dry and warm, but it’s also our busiest season, so you’re usually waiting longer between enquiring and actually getting your Garage. A lot of people who start considering a project in June when the sun comes out, underestimate lead times in summer, and end up with a building that isn’t ready until October.

    A January delivery gives you a space to escape to during the miserable months. And by the time it starts getting warmer and lighter in the evenings, everything is set up and ready to enjoy, just how you like it. If any of your new year’s resolutions involve spending more time on hobbies, getting more exercise, or clearing out the house (storage heaven!) a dedicated space like a Garage could be the incentive you need. 

    Two garages side by side, one with the garage door open showing a ride-on-mower inside.

    4. What about Christmas?

    I get why taking on a big project at this time of year might seem daunting, when there’s already so much pressure. You always spend more on Christmas than you expect, and you probably don’t want to get in over your head with Garage project costs on top of that. 

    With G&M you’ll never need to commit to a Garage project without knowing the full cost first. On top of the Garage itself, you also need to think about a garage door, a concrete base, and the electrics. Before you pay any deposit, you’ll always have your full itemised quote from us, your base quote, and your electrics quote. This way it’s always clear what everything costs before you’re committed.

    Your Garage also isn’t due in one big payment. Here’s how our payments are broken down:

    • 30% deposit to secure your delivery date (this is only paid once you’re happy with all quotes)
    • 40% 7 days before delivery 
    • 30% on completion of your building (once the garage door has been installed)

    If your worry is less about budget and more about time at Christmas, you’re not alone. The good news is that our team project manages each Garage build. Here’s how it works:

    Our Team:

    • Organises site visits 
    • Makes introductions to groundworkers and electricians 
    • Creates your concrete base plans
    • Schedules your concrete base construction 
    • Schedules your electrical installation 
    • Organises your Garage door installation 
    • Delivers and assembles your Garage 

    Eve, Kieran and Ailsa take care of everything in the background, from scheduling to communications, so that you can get on with life as usual. You don’t need to spend time chasing third parties because we organise everything with our accredited trades that we work with week in, week out.

    Kieran stands in front of a timber garage with a rose bush in the background.
    Sales Manager Kieran

    What could a January project look like?

    If you’re still not sure how a Garage delivery this January could work, here’s an example timeline of how things could go. 

    Double Garage Timeline

    Delivery: 26th & 27th January 

    Planning & Quotes

    • Early Nov: chat with Kieran about your project
    • Kieran draws up your Garage quote
    • Mid Nov: Site visits for groundwork and electrics
    • Quotations for groundwork and electrics

    Order & Drawings 

    • By 30th Nov: order placed and deposit paid 
    • We order your garage door, uPVC and materials 
    • Early Dec: Grant draws the autocad for your Garage

    Groundworks

    • Mid Dec: groundworks start
    • Concrete base is cured for 2 weeks
    • Early Jan: shuttering is removed

    Making Your Garage

    • uPVC and materials are delivered to our workshop
    • Mid Jan: Bobbie cuts the timber for your Garage
    • Jamie makes your Garage panels

    Delivering Your Garage

    • 25th Jan: Delivery team loads the vans with your Garage
    • 26th & 27th Jan: Delivery team assembles your Garage onsite
    • 28th Jan: Electrics are installed
    • 29th Jan: Garage door is installed 
    • Your Garage is ready to enjoy!
    A man uses a nail gun to attach a timber board to a panel.
    Jamie making a panel

    Can I have a Garage in January?

    Yes, you can have a G&M Garage in January and it’s a great time to do it. Despite common misconceptions, the winter weather won’t stop your base from setting and your delivery is very rarely moved because of it. Plus, G&M Garage won’t get in the way of your Christmas commitments because there’s no hidden costs and our team is always covering the logistics. 

    So even though it seems a bit backwards to start a garden project in winter, there’s actually a lot of upsides. You’ll save on your Garage by getting ahead of the price increase, get timber that’s had the maximum time to dry, and have your Garage door installed straight away. 

    So if a January Garage delivery is ticking all your boxes, you’re in luck because we’ve got six spaces left for January 2027. 

    These first four are ideal for a Workshop or Single Garage (up to 6m x 4m):

    • 13th January 
    • 15th January 
    • 22nd January
    • 29th January 

    These next two spots are designed for a Double Garage project (up to 6m x 5m):

    • 19th & 20th January 
    • 26th & 27th January 

    Not sure whether you need a single or double garage? Don’t worry, our Sales Manager Kieran is here to help. The best thing to do is to book a Consultation, where you’ll get dedicated time with Kieran to discuss your Garage plans. 

    To secure your January delivery, get in touch here, or give us a call on 01821 642 713. Remember that our January spots are only available until the 30th November 2026.